Trace the outline, add the dots, click Analyse. That one roof powers the Full Estimator, every calculator and the client-ready quote.

Most of it happens for you. You draw the outline and the dots; TARC does the rest.
Type the site address or pick the client from your CRM. TARC pulls up the aerial photo straight away, in HD across NSW and Queensland.

Click around the edge of the roof, then drop a dot wherever the hips, valleys and ridges meet. That’s all the drawing you do.

TARC works out every face, hip, valley and ridge, picks up the pitch, and fills in the materials, labour and every calculator. Drag, delete or change any line in a click.

Your branded PDF: the total up front, the roof plan, sheet layout and cut list, cost breakdown and terms, plus a supplier order ready to send.

Every project, variation, schedule and client conversation in one place. Your CRM and your estimator finally talk to each other.

Your client gets a private link: they pick Good, Better or Best, choose their Colorbond colour and accept online. The contract and deposit invoice are one click.
Short, honest answers about TARC and how a quote comes together.
Type the address and TARC pulls up the aerial photo (HD across NSW and Queensland). Trace the outline of the roof, drop a dot wherever the hips, valleys and ridges meet, and click Analyse. TARC works out every face, hip, valley and ridge, picks up the pitch, and turns it into true areas, materials, labour and a priced quote. You check it and can drag, delete or change any line.
Every roof you trace becomes a reusable Roof Profile. That one profile fills in the Full Estimator and every calculator — Guttering, Flashing Designer, Battens & Insulation, Ventilation, Pitch, Weather Load, Waste Optimiser and Quick Estimator — so you never trace the same roof twice.
A few minutes for most houses. You trace the outline and add the dots; Analyse builds the roof in seconds, and materials, waste and crew-based labour are worked out for you. A complex roof takes a little longer to check.
No. You only trace the outline and drop a dot where the hips, valleys and ridges meet. Click Analyse and TARC draws every face and line for you. Flat or skillion roofs need no dots at all.
Yes, across New South Wales and Queensland. It is far sharper than standard satellite maps, so you can see every hip, valley and penetration, and it loads as soon as you pick the address. Everywhere else in Australia you get standard satellite imagery, and you can always trace on drone photos or plans.
Yes. With the Estimate Service you send the address and we send back the full report: measurements, materials, labour, a bill of materials, the sheet layout and a client-ready PDF on your company details. From $149 AUD incl. GST, same-day on most jobs.
Yes. TARC is built in Australia for Australian roofers. Pricing is AUD, calculations follow AS 1562.1 and AS/NZS 3500.3 conventions, materials are mapped to common Australian suppliers, and every PDF includes Australian-standard inclusions, exclusions and GST handling.
TARC supports every common Australian residential and light-commercial roof type: Hip, Gable, Dutch Gable, Skillion, Mansard and complex multi-face roofs. Each face can have its own pitch, and materials include Colorbond Corrugated, Trimdek, Spandek, concrete tile, terracotta tile and metal standing seam.
Yes. TARC ships with a built-in Australian materials database, and you can add your own supplier prices and product SKUs. Your custom pricing carries through every calculator and every quote PDF automatically.
Every estimate produces a client-ready PDF on your company details: the total up front, the roof plan, scope of works, next steps and terms. A technical section adds the sheet layout with every sheet numbered, the cut list, flashing layout and bend drawings, nett quantities and true lengths. You also get a supplier order ready to send.
Every new account gets a 7-day free trial with all tools unlocked, no credit card needed. After that, plans start at $99 a month, or you can pay $19 for a single estimate. See the Pricing page for each plan.
Yes. Each sheet is drawn at its real cover width for the profile you picked (762 mm for corrugated, 700 mm for Klip-Lok and so on) and cut to the shape of your roof, so the sheets against a hip or valley show their raked cut. Every sheet is numbered, and the cut list gives its true length down the slope, including the eave overhang. The drawing is a plan view, so sheets look shorter on paper than their listed length. The last sheet in a run is a full sheet, ripped or overlapped on site. As with any measure, check it on site before you order.
Try it on your next roof. Every tool is unlocked for 7 days.
Start free trial